Category: Staff

Facility Notice – School Closed Management During Summer Holiday

Dear all,

Due to scheduled facilities maintenance, system testing and renovation work, NIS campus will be under closed management from June 18th, 12pm to August 2nd, 12am.

During this period:
1. The Centre offices, HUB and Section A&B offices will be open and operational as usual.
2. Section C&D, PAC building, Swimming Pool and Gyms will be closed.
3. The main access corridor at the Centre 1F will be closed.
4. The fitness room will be open throughout the holiday as normal open hours.

And for Access:
1. Cars enter and exit campus through Gate No. 2.
2. Staff working in Main Building will enter and exit campus via Gate No. 4.
3. Contractors will have access through registration.
4. Visitors will have access through Visit Manager system.
5. Section C&D will be enclosed with no access except for construction personnel.
6. The staff lounge will be turned into construction management and QS office.

For access protocols, please refer to the designated routes for campus access and follow the instruction of security personnel on site.

Thank you for your attention and cooperation.
Facility Team

Alumni Panel Discussion

Event Details

Date: Wednesday, 17 June 2026

Time: 10:10 a.m. – 11:00 a.m.

Venue: Skyways, NIS Centre Building, 2nd Floor

Audience: Grade 11 Students & Secondary Parents

CMB Notice

CMB Qixia Branch will CLOSE on June 19, 20 and OPEN on June 21, 2026 during Dragon Boat Festival.

Facility Notice – School Closed Management During Summer Holiday

Dear all,

Due to scheduled facilities maintenance, system testing and renovation work, NIS campus will be under closed management from June 18th, 12pm to August 2nd, 12am.

During this period:
1. The Centre offices, HUB and section A&B offices will be open and operational as usual.
2. Section C&D, PAC building, Swimming Pool and Gyms will be closed.
3. The main access corridor at the Centre 1F will be closed.
4. The fitness room will be open throughout the holiday as normal open hours.

And for Access:
1. Cars enter and exit campus through Gate No. 2.
2. Staff working in Main Building will enter and exit campus via Gate No. 4.
3. Contractors will have access through registration.
4. Visitors will have access through Visit Manager system.
5. Section C&D will be enclosed with no access except for construction personnel.
6. The staff lounge will be turned into construction management and QS office.

For access protocols, please refer to the designated routes for campus access and follow the instruction of security personnel on site.

Thank you for your attention and cooperation.
Facility Team

Coaching Opportunities for 2026/27

Hi everyone, a big thank you to all those to participated in the coaching programme this year. We appreciate you time in supporting the students. We will have some opportunities due to some wonderful coaches leaving us so please look below and see if you are interested in still coaching or would like to join a coaching team. The teams, coaches and training days are not 100% confirmed yet so please come and talk to myself or Ms Vicki if you have an interest.

Season 1 we have some spaces for the following:

  • U12 and U15/19 Table Tennis Coach and Team manager/assistant coach
  • U12 Girls and U15 Football Team manager/assistant for both teams
  • Ultimate Frisbee U12 + U15/19 Team manager/assistant coach
  • U19 Volleyball Team manager/assistant coach

All IT Items Due Today!

Hi everyone,

As we wrap up the school year, the IT department is starting our annual inventory and maintenance process. If you’ve borrowed any devices—laptops, iPads, charging cables, bricks, or anything else from us—please make sure to return them by Tuesday, June 16th, 2026. Please return your items at the IT support window located on the first floor of the HUB.

Also, just a heads-up: Monday, June 15th will be the last day we allow checkouts. After that, we’ll be focused entirely on collecting and preparing everything for summer updates and repairs.

Thanks for your help in keeping things organized and ready for next year!

If you have any questions please reach out.

Wishing you all a relaxing, fun, and well-deserved summer break. See you in August, recharged and ready to go!

– The IT Department

Facility Notice – School Closed Management during Summer Holiday

Dear all,

Due to scheduled facilities maintenance, system testing and renovation work, NIS campus will be under closed management from June 18th, 12pm to August 2nd, 12am.

During this period:
1. The Centre offices, HUB and section A&B offices will be open and operational as usual.
2. Section C&D, PAC building, Swimming Pool and Gyms will be closed.
3. The main access corridor at the Centre 1F will be closed.
4. The fitness room will be open throughout the holiday as normal open hours.

And for Access:
1. Cars enter and exit campus through Gate No. 2.
2. Staff working in Main Building will enter and exit campus via Gate No. 4.
3. Contractors will have access through registration.
4. Visitors will have access through Visit Manager system.
5. Section C&D will be enclosed with no access except for construction personnel.
6. The staff lounge will be turned into construction management and QS office.

For access protocols, please refer to the designated routes for campus access and follow the instruction of security personnel on site.

Thank you for your attention and cooperation.
Facility Team

Refrigerators Clean-out Reminder 

Dear all, 

Please remove all personal food and items from the Staff Room and Early Year Kitchen refrigerators by 12:00 PM on Friday, June 18. 

Any items remaining after this deadline will be disposed of. 

Thank you for your cooperation. 

Facility Team 

All IT Items Due June 16th

Hi everyone,

As we wrap up the school year, the IT department is starting our annual inventory and maintenance process. If you’ve borrowed any devices—laptops, iPads, charging cables, bricks, or anything else from us—please make sure to return them by Tuesday, June 16th, 2026. Please return your items at the IT support window located on the first floor of the HUB.

Also, just a heads-up: Monday, June 15th will be the last day we allow checkouts. After that, we’ll be focused entirely on collecting and preparing everything for summer updates and repairs.

Thanks for your help in keeping things organized and ready for next year!

If you have any questions please reach out.

Wishing you all a relaxing, fun, and well-deserved summer break. See you in August, recharged and ready to go!

– The IT Department